| BSS | Mission Mile: Sepulveda Visioning for a Safe and Active Community ATPL-5006(920) | 7 | $79.6M | Complete | Active Transportation Program Cycle 5 | — | — |
| BSS | Broadway-Manchester Active Transportation Equity Project ATPL-5006(895) | 8 | $68.4M | Construction | ATP Cycle 4 | — | — |
| BSS | Western Our Way: Walk and Wheel Improvements ATPL 5006 (947) | 8 | $54.4M | Complete | Active Transportation Program Cycle 6 | — | — |
| BSS | Connecting Canoga Park through Safety and Urban Cooling ATPL-5006(918) | 3 | $53.7M | Pre-Design | Active Transportation Program Cycle 5 | — | — |
| BSS | Osborne St: Path to Park Access Project ATPL 5006 (946) | 7 | $49.8M | Pre-Design | Active Transportation Program Cycle 6 | — | — |
| BSS | Skid Row Connectivity and Safety Project ATPL 5006 (944) | 14 | $47.6M | Pre-Design | Active Transportation Program Cycle 6 | — | — |
| BSS | Skid Row Connectivity and Safety Project | — | $47.5M | — | — | PA&ED Phase 6/30/2026 | ⚠ |
| BSS | Wilmington Safe Streets: A People First Approach ATPL 5006 (945) | 15 | $40.8M | Pre-Design | Active Transportation Program Cycle 6 | — | — |
| BSS | Wilmington Safe Streets: A People First Approach | — | $40.8M | — | — | PA&ED Phase 6/30/2026 | ⚠ |
| BSS | Broadway-Manchester Multi-Modal Green Streets Project (Measure W) ATPL-5006 (895) | 8 | $38.6M | Design | Safe Clean Water Program Round 2 | — | — |
| BSS | Boyle Heights Community Connectivity Project ATPL - 5006 (951) | 14 | $37.7M | Pre-Design | Active Transportation Program Cycle 6 | — | — |
| BSS | Boyle Heights Community Connectivity Project | — | $37.7M | — | — | PA&ED Phase 6/30/2026 | ⚠ |
| LADOT | CA-2023-131-00 | 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 | $36.5M | Active | Total Federal Funds: $24,422,282 Total Local Match $12,048,000 Total Eligible Project Cost: $36,470,282 | 4/30/2028 | — |
| BSS | Eagle Rock Bl Multi-Modal Transportation Improvements STPL-5006(907) | 14 | $33.5M | Pre-Design | SR 710 MIP, Measure W | — | — |
| LADOT | CFP2009, CRRSAA & WSCCOG: Exposition II- West Bikeway Northvale Segment DOT171 | 5 | $31.1M | 99% Design (Active) | CMAQ: $4,416,000.00 MMLRF: $3,168,000.00 Oth: $3,200,000.00 PropC: $2,826,000.00 SCAG: $13,279,500.00 ST: $5,293,000.00 Total funding: $32,182,500.00 | 12/31/2026 | — |
| LADOT | ATP 6: SRTS Center City Schools Neighborhood Safety & Climate Resilience Project DOT214 | 1, 10, 13 | $30.8M | 2% Design (Active) | ATP: $30,766,000.00 PropC: $5,472,000.00 Total funding: $36,238,000.00 | 8/30/2030 | — |
| BSS | Normandie Beautiful: Creating Neighborhood Connections in South L.A ATPL 5006 (948) | 8 | $27.8M | Pre-Design | Active Transportation Program Cycle 6 | — | — |
| BOE | Eastern Avenue Multi-Modal Transportation Improvement Project - STPL-R & CMAQ Funds | — | $24.9M | — | — | 12/31/2026 | ⚠ |
| LADOT | San Fernando Rd Bikepath Phase IIIA Construction DOT084 | 2, 6 | $24.0M | 2% Post-Construction (Active) | ATP: $21,195,000.00 PropC: $4,235,000.00 Total funding: $25,430,000.00 | 6/30/2027 | — |
| LADOT | CA-2019-115-00 | 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 | $23.4M | Active | Total Federal Funds: $18,292,150 Total Local Match: $5,089,144 Total eligible cost: $23,381,294 | 9/1/2028 | — |
| LADOT | CA-2020-215-00 | 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 | $22.1M | Active | Total Federal Funds: $16,192,200 Total Local Match: $5,909,830 Total Eligible Cost: $22,102,030 | 9/1/2028 | — |
| LADOT | Universal Basic Mobility: Phase I South LA UBM Pilot | 8, 9, 10 | $20.2M | Operations | MMLRF: $438,509.76 Oth: $5,927,017.84 CARB STEP: $13,843,298 | 4/30/2027 | — |
| LADOT | CA-2025-243-00 | 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 | $19.2M | Active | Total Federal Funds: $15,364,711 Total Local Match: $3,841,181 Total Eligible Cost: $19,205,891 | 8/1/2028 | — |
| BOE | ATP Cycle 4 - LA Riverway Segment 1 and 2 | — | $18.6M | — | — | 7/30/2026 | ⚠ |
| LADOT | Pico Safety and Mobility Plan Project | 1, 9, 10 | $18.4M | 95% Design (Active) | MAT Cycle 2: $15,467,473 In-house Vision Zero Program amount TBD (likely to use SB1 local returns) | 29/30 | — |
| LADOT | ATSAC Enhancements for an Advanced Transportation Infrastructure TLSP-5006(913) DOT204 | — | $18.4M | 100% Construction (Active) | Oth: $18,361,000.00 PropC: $400,000.00 Total funding: $18,761,000.00 | 6/30/2026 | — |
| LADOT | ATP 4: SRTS Liechty Middle and Neighborhood ES DOT164 | 1 | $18.2M | 95% Design (Active) | ATP: $23,198,000.00 CTIEP: $852,625.00 PropC: $6,087,000.00 SCAG: $2,200,000.00 Total funding: $32,337,625.00 | 6/30/2031 | — |
| BSS | 67th Street and West Boulevard Civil Improvements Project | 8 | $13.0M | Pre-Construction | — | — | — |
| LADOT | Boyle Heights/Cesar Chavez Great Streets -Brittania St. to Evergreen Ave. DOT167 | 14 | $13.0M | 1% Construction (Active) | CMAQ: $10,787,000.00 MeasR: $1,916,389.00 PropC: $2,523,000.00 Total funding: $15,226,389.00 | 12/31/2029 | — |
| BOE | ATP Cycle 3- Downtown Los Angeles Arts District Pedestrian and Cyclist Safety Project | — | $12.3M | — | — | 9/30/2026 | ⚠ |
| BSS | Northeast LA Active Transportation & Transit Connectivity Enhancements STPL-5006(906) | 14 | $11.5M | Design | SR 710 MIP, RIP-STP | — | — |
| BSS | SRTS Berendo Middle and Leo Politi, Hoover Street, and Magnolia Avenue Elementary Schools Project ATPL-5006(930) | 1 | $11.1M | Design | ATP Cycle 5 | — | — |
| LADOT | MAT Cycle 1: Avalon / Martin Luther King / Gage Corridor DOT190 | 9 | $10.3M | 98% Design (Active) | MMLRF: $8,023,724.00 PropC: $2,176,276.00 Total funding: $10,200,000.00 | 6/30/2028 | — |
| BSS | Pico Blvd and Flower St Improvements (RCN Grant) N/A | 14 | $10.0M | Complete | FTA Recoonecting Community and Neighbor Grant | — | — |
| LADOT | CFP2009 & CRRSAA: L.A. River Bike Path - Phase IV Construction DOT060 | 4 | $9.3M | 86% Design (Active) | CMAQ: $1,827,000.00 Oth: $4,959,630.00 PropC: $457,000.00 Total funding: $7,243,630.00 | 12/31/2026 | — |
| LADOT | Central Avenue Historic Corridor Streetscape - LAF3656 DOT199 | 9 | $8.5M | 0% Construction (Active) | CTIEP: $6,600,000.00 PropC: $891,000.00 RSTP: $1,697,000.00 Total funding: $9,188,000.00 | 6/30/2030 | — |
| BSS | Wayfinding & Transit Amenities in Downtown Los Angeles | 14 | $8.4M | Pre-Design | — | — | — |
| LADOT | WSCCOG: Westwood Boulevard Safety and Mobility Project DOT221 | 5 | $8.0M | 5% Design | MMLRF: $9,600,000.00 Total funding: $9,600,000.00 | 7/1/2030 | — |
| BSS | Maya Corridor Streetscape | 1 | $7.7M | Complete | CRA/LA Excess Bond Proceeds | — | — |
| LADOT | HSIP 8 Left Turn Signal Modification and Median Island DOT177 | 2, 3, 4, 6, 7, 8, 9, 11, 12, 15 | $7.1M | 45% Construction (Active) | CTIEP: $2,000,000.00 HSIP: $5,244,400.00 Oth: $334,964.34 PropC: $582,711.11 ST: $1,000,000.00 Total funding: $9,162,075.45 | 6/30/2028 | — |
| LADOT | WSCCOG: Santa Monica to Westwood Stress-Free Bicycle Enhanced Corridor DOT192 | 5, 11 | $6.7M | 65% Design (Active) | MMLRF: $10,406,584.00 Total funding: $10,406,584.00 | 6/30/2029 | — |
| BSS | Martin Luther King (MLK) Bl Streetscape | 9 | $6.5M | Design | CTIEP | — | — |
| LADOT | HSIP 7 - RRFB Ramps and Median Islands - 28 locations DOT175 | 1, 4, 5, 8, 9, 11, 13, 14, 15 | $6.5M | 75% Construction (Active) | HSIP: $4,140,800.00 Total funding: $4,140,800.00 | 6/30/2028 | — |
| LADOT | ATP 5: SRTS Panorama City Elementary School Project DOT196 | 6 | $6.1M | 35% Design (Active) | ATP: $6,149,000.00 PropC: $683,000.00 Total funding: $6,832,000.00 | 6/30/2031 | — |
| LADOT | ATP 5: SRTS Carver Middle and Ascot Avenue and Harmony Elementary Schools Project DOT197 | 9 | $6.0M | 50% Design (Active) | ATP: $6,030,000.00 PropC: $670,000.00 Total funding: $6,700,000.00 | 6/30/2031 | — |
| BSS | El Sereno Active Transportation & Transit Connectivity Enhancements STPL-5006(911) | 14 | $6.0M | Design | SR 710 MIP | — | — |
| LADOT | Universal Basic Mobility: Phase II South LA EcoLab DOT220 DOT218 | 8, 9 | $5.7M | SFC: 26% Construction (Active) Chargers: 50% Construction (Active) E-bike Library: Operations | PropC: $67,212 MMLRF: $132,235 Prop A: $67,775 Measure R: $250,000 Oth: $1,100,000 TCC: $4,130,028 | 8/1/2028 | — |
| LADOT | ATP 4: SRTS 112th St. and Flournoy ES Safety IMPR Project DOT163 | 15 | $5.6M | 50% Bid & Award (Active) | ATP: $5,600,000.00 PropC: $1,399,000.00 Total funding: $6,999,000.00 | 3/21/2031 | — |
| LADOT | HSIP 7 - Left Turn Phasing - 17 locations citywide DOT174 | 2, 4, 8, 9, 10, 12, 15 | $5.4M | 75% Construction (Active) | HSIP: $4,496,900.00 Total funding: $4,496,900.00 | 6/30/2028 | — |
| LADOT | HSIP 8 - New Signals DOT176 | 3, 5, 6, 8, 9, 10 | $5.3M | 95% Construction (Active) | CTIEP: $1,580,097.13 HSIP: $4,755,600.00 PropC: $528,400.00 Total funding: $6,864,097.13 | 6/30/2027 | — |
| LADOT | Chandler Cycletrack Gap Closure Project DOT137 | 2, 4 | $5.1M | 5% Construction (Active) | CMAQ: $3,177,750.00 PropC: $794,437.00 ST: $1,900,000.00 Total funding: $5,872,187.00 | 6/30/2028 | — |
| LADOT | Figueroa Street Mall 2028 | 14, 9 | $5.1M | Planning & Design | Metro Open Streets: $1,032,549 SS4A: $2,862,500 | 28/29 | — |
| BSS | Clean CA - Martin Luther King Jr. Boulevard Equity & Connectivity through Greening CCL-5006(936) | 9 | $5.0M | Construction | Clean California Local Grant Program | — | — |
| BSS | Clean CA - Creating Urban Habitat & Biodiversity through Median Greening CCL-5006(934) | 1, 8, 9, 10, 15 | $5.0M | Construction | Clean California Local Grant Program | — | — |
| LADOT | Traffic Signal Rail Crossing Improvement Project DOT131 | — | $4.4M | 5% Construction (Active) | LT: $4,179,400.00 PropC: $1,044,850.00 Total funding: $5,224,250.00 | 2/28/2026 | — |
| LADOT | Central LA MSP 2021: Lockwood Ave ES SRTS Plan DOT208 | 13 | $4.4M | 3% Pre-Design (Active) | MMLRF: $4,400,000.00 Total funding: $4,400,000.00 | N/A Project funds to be repurposed | — |
| LADOT | 2017 Earmark - Northeast Valley Traffic and Mobility Improvements DOT153 | 7 | $4.4M | 80% Post-Construction (Active) | PropC: $1,165,536.00 SAFTLU: $4,662,146.00 Total funding: $5,827,682.00 | 6/30/2027 | — |
| LADOT | ATP 4: SRTS Alexandria Avenue ES Neighborhood Safety IMPR Project DOT165 | 10, 13 | $4.2M | 99% Design (Active) | ATP: $4,480,000.00 PropC: $1,120,000.00 Total funding: $5,600,000.00 | 6/30/2030 | — |
| LADOT | CA-2024-148-00 | 15 | $4.1M | Active | Total Federal Funds: $3,136,998
Total Non-Federal Share $829,250
Total Eligible Project Cost: $4,146,247 | 3/31/2029 | — |
| LADOT | CA-2020-202-01 | 14 | $4.0M | Active | Total Federal Funds: $3,215,977 Total Local Match $803,994 Total Eligible Project Cost: $4,019,971 | 1/1/2027 | — |
| LADOT | San Fernando Rd Widening at Balboa Rd DOT179 | 12 | $3.9M | 0% Construction (Active) | CMAQ: $1,061,000.00 CTIEP: $1,409,698.00 Oth: $1,000,000.00 PropC: $1,109,462.00 Total funding: $4,580,160.00 | 6/30/2028 | — |
| LADOT | Olympic Blvd and Mateo Street Imp DOT178 | 14 | $3.9M | 3% Post-Construction (Active) | LT: $4,624,000.00 PropC: $2,490,308.00 Total funding: $7,114,308.00 | 2/28/2026 | — |
| LADOT | HSIP 6 Project 3 - RRFB and New Traffic Signals at 27 Locations DOT173 | 1, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 | $3.6M | 99% Construction (Active) | HSIP: $1,003,520.00 Oth: $2,638,704.30 PropC: $143,400.00 Total funding: $3,785,624.30 | 6/30/2029 | — |
| BSS | MAT FLM - Sepulveda/OL | 4, 6 | $3.6M | Design | Measure M MAT - Metro Active Transport | — | — |
| LADOT | Mid City - Low Stress Bicycle Enhancement Corridors DOT147 | 4, 13 | $3.6M | 50% Construction (Active) | CMAQ: $1,806,765.00 CTIEP: $1,810,500.00 PropC: $883,629.00 SCAG: $1,810,419.00 Total funding: $6,311,313.00 | 6/30/2028 | — |
| LADOT | WSCCOG: Connect Del Rey Stress-Free Bicycle Enhanced Corridor DOT194 | 11 | $3.5M | 50% Design (Active) | MMLRF: $6,212,768.00 Total funding: $6,212,768.00 | 6/30/2029 | — |
| LADOT | Universal Basic Mobility: Phase III UBM E-bike Voucher Program | — | $3.4M | Planning & Design | Metro Call for Projects: $1,518,124 MMLRF: $398,267 LCFS: $1,500,000 | 2/28/2026 | — |
| LADOT | Balboa Bl Widening at Devonshire Street - 2011 Call DOT166 | 12 | $3.4M | 98% Construction (Active) | CTIEP: $1,569,392.00 PropC: $650,629.00 RSTP: $1,208,311.00 Total funding: $3,428,332.00 | 6/30/2026 | — |
| BSS | MAT (FLM) Aviation/LAX | — | $3.3M | Design | — | — | — |
| LADOT | Pedestrian Improvements along Central Ave from Washington to Vernon Ave DOT198 | 9 | $3.0M | 99% Design (Active) | CTIEP: $1,500,000.00 PropC: $414,000.00 SAFTLU: $1,490,234.00 Total funding: $3,404,234.00 | 6/30/2030 | — |
| LADOT | SBCCOG MSP: Wilmington Neighborhood Friendly Streets DOT159 | 15 | $3.0M | 12% Pre-Design (Active) | MMLRF: $3,000,600.00 Total funding: $3,000,600.00 | 6/30/2030 | — |
| BSS | Revitalize Rose Avenue - A Pedestrian Connectity & Beautification Project | 11 | $3.0M | Design | — | — | — |
| BOS | Volkswagen Environmental Mitigation Trust Program 2021 - Volkswagen Environmental Mitigation Trust Program 2021 | — | $3.0M | — | — | 5/1/2025 | ⚠ |
| LADOT | Central LA MSP 2021: Integrated Mobility Hubs Program DOT211 | 13, 14 | $2.8M | 90% Design (Active) | MMLRF: $2,790,491.00 Total funding: $2,790,491.00 | 5/20/2029 | — |
| LADOT | SBCCOG MSP: Crossing Upgrades DOT161 | 15 | $2.8M | 99% Design (Active) | MMLRF: $3,260,625.00 Total funding: $3,260,625.00 | 6/30/2030 | — |
| LADOT | HSIP 11 - Figueroa Priority Corridor Systemic Safety Improvements DOT215 | 8, 9 | $2.6M | 0% Bid & Award (Active) | HSIP: $2,383,830.00 PropC: $264,870.00 Total funding: $2,648,700.00 | 2/28/2029 | — |
| LADOT | TCC - Watts Rising - Walkbike Watts DOT181 | 15 | $2.6M | 98% Post-Construction (Active) | Oth: $3,092,760.00 Total funding: $3,092,760.00 | 12/31/2025 | — |
| BSS | Brentwood Walkability Enhancements MM4801.08 | 11 | $2.6M | Construction | Measure M MSP - Active Transportation | — | — |
| LADOT | ATCMTD - Mobility enhancements and traffic safety in the Los Angeles Promise Zone DOT212 | — | $2.4M | 79% Construction (Active) | Oth: $3,000,000.00 Total funding: $3,000,000.00 | 5/31/2027 | — |
| BSS | Walk Pico! A Catalyst for Community Vitality & Connectivity CML-5006(862) | 5 | $2.3M | Construction | 2013 Metro Call for Projects | — | — |
| BSS | Washington Bl Transit Enhancements Phase 2 CML-5006(856) | 9, 14 | $2.3M | Construction | 2011 Call for Projects/CRA | — | — |
| BSS | L.A. River Bike Path - Phase IV Construction | 4 | $2.3M | Design | Metro Call for Projects | — | — |
| LADOT | SBCCOG MSP: ATSAC Communications System Resiliency Improvement in San Pedro DOT157 | 15 | $2.3M | 75% Construction (Active) | MMLRF: $2,500,000.00 Total funding: $2,500,000.00 | 6/30/2026 | — |
| BOE | CA Natural Resources Agency - Urban Greening Grant | — | $2.2M | — | — | 3/31/2028 | ⚠ |
| LADOT | HSIP 6 - 5 New Signals in HW and SP DOT050 | 8, 13, 15 | $2.1M | 98% Construction (Active) | CTIEP: $500,000.00 HSIP: $888,200.00 Oth: $944,866.65 PropC: $98,800.00 Total funding: $2,431,866.65 | 6/30/2026 | — |
| LADOT | Central LA MSP 2021: Los Angeles SRTS Elementary School DOT206 | 10 | $2.1M | 0% Pre-Design (Active) | MMLRF: $2,098,103.00 Total funding: $2,098,103.00 | N/A Project funds to be repurposed | — |
| LADOT | TCC: South LA Eco Lab - EV Carshare DOT219 | 8, 9, 10 | $2.1M | Cancelled | Oth: $1,468,475.00 TCC: $2,097,160.00 Total funding: $3,565,635.00 | 9/30/2025 | — |
| LADOT | Wilshire Open Street: Park to Park a Westlake Celebration 2028 | 1, 10 | $2.0M | Planning & Design | Metro Open Streets: $163,611
SS4A: $1,431,250 | 28/29 | — |
| LADOT | SBCCOG MSP: Signal Operational Improvements DOT160 | 15 | $2.0M | 5% Construction (Active) | MMLRF: $2,500,000.00 Total funding: $2,500,000.00 | 6/30/2029 | — |
| LADOT | Imperial Highway Bike Lanes DOT056 | 11 | $1.9M | 98% Construction (Active) | CMAQ: $1,858,000.00 PropC: $464,000.00 Total funding: $2,322,000.00 | 6/30/2027 | — |
| LADOT | HSIP 6 - 5 New Signals DOT049 | 4, 5 | $1.8M | 98% Construction (Active) | CTIEP: $500,000.00 HSIP: $845,800.00 Oth: $650,287.01 PropC: $94,100.00 Total funding: $2,090,187.01 | 6/30/2026 | — |
| LADOT | Hollywood Open Street 2028 | 13 | $1.8M | Planning & Design | SS4A: $1,431,250 | 28/29 | — |
| LADOT | HSIP 10 - Retroreflective backplate upgrades DOT203 | — | $1.7M | 61% Construction (Active) | HSIP: $1,884,000.00 Total funding: $1,884,000.00 | 6/30/2029 | — |
| LADOT | SR710 LATIP: DASH El Sereno / City Terrace DOT155 | 14 | $1.6M | 99% Right of Way/Approvals (Active) | CMAQ: $2,000,000.00 Total funding: $2,000,000.00 | 12/31/2030 | — |
| LADOT | SBCCOG MSP: ATSAC Fiber Communications Network Integration with LA County DOT158 | 15 | $1.6M | 75% Construction (Active) | MMLRF: $2,000,000.00 Total funding: $2,000,000.00 | 12/31/2026 | — |
| LADOT | SMART: Code the Curb: DTLA (Digital Curb Management) DOT216 | 9, 14 | $1.6M | 95% Design (Active) | Oth: $2,000,000.00 Total funding: $2,000,000.00 | — | — |
| LADOT | North Hollywood Open Street 2028 | 2 | $1.6M | Planning & Design | Metro RCN Grant: $1,600,000 | 28/29 | — |
| LADOT | 2016 Earmark - Install Leading Pedestrian Interval (LPI), Pedestrian Actuated Warning Devices (AWDs DOT152 | 1, 2, 3, 4, 6, 11, 12, 13 | $1.6M | 10% Post-Construction (Active) | CTIEP: $492,000.00 Oth: $1,846,102.00 PropC: $2,010,371.00 Total funding: $4,348,473.00 | 6/30/2025 | — |
| LADOT | Menlo Ave / MLK Vermont Expo Station Ped Improvements DOT076 | 9 | $1.5M | 0% Design (Active) | CMAQ: $1,687,350.00 PropC: $1,615,000.00 Total funding: $3,302,350.00 | 12/31/2026 | — |
| BOS | GREENfiltration - Urban and Community Forestry Grant Program | — | $1.5M | — | — | 3/30/2026 | ⚠ |
| LADOT | SR710 LATIP: DASH Highland Park / Eagle Rock DOT156 | 14 | $1.5M | 10% Bid & Award (Active) | CMAQ: $1,500,000.00 Total funding: $1,500,000.00 | 12/31/2026 | — |
| BSS | Laurel Canyon Blvd and Wicks St. ADA Improvements | CD 6 | $1.5M | Design | — | — | — |
| BOE | Surface Transportation Program – Local Regional Funds (Soto St Widening between Multnomah and Mission) | — | $1.4M | — | — | 12/31/2026 | ⚠ |
| LADOT | CA-2025-253-00 | 13, 14 | $1.4M | Active | Total Federal Funds: $1,208,000 Total Local Match: $156,509 Total eligible cost: $1,364,509 | 5/20/2029 | — |
| LADOT | Valencia Triangle Landscape Beautification Plaza DOT101 | 1 | $1.3M | 95% Design (Active) | LT: $553,000.00 MMLRF: $733,397.00 PropC: $298,000.00 Total funding: $1,584,397.00 | 6/30/2027 | — |
| LADOT | Central LA MSP 2021: Manchester Elementary SRTS DOT213 | 8 | $1.3M | 50% Construction (Active) | MMLRF: $1,623,500.00 Total funding: $1,623,500.00 | 6/30/2028 | — |
| LADOT | ATP 2 - Pedestrian and Bicycle Neighborhood Intersection Enhancements DOT162 | 5, 7, 9, 14 | $1.3M | 2% Post-Construction (Active) | ATP: $1,396,000.00 PropC: $349,000.00 Total funding: $1,745,000.00 | 6/30/2025 | — |
| BSS | San Vicente Median Greening | 11 | $1.2M | Design | Design | — | — |
| LADOT | Western Av Bus Stop & Pedestrian Improvement DOT107 | 8, 10 | $1.2M | 90% Post-Construction (Active) | CMAQ: $1,178,000.00 PropC: $294,500.00 Total funding: $1,472,500.00 | 6/30/2025 | — |
| LADOT | Westlake MacArthur Park Pedestrian Improvement DOT108 | 1 | $1.2M | 1% Post-Construction (Active) | CMAQ: $1,182,666.00 PropC: $295,667.00 Total funding: $1,478,333.00 | 6/30/2028 | — |
| LADOT | LANI - West Boulevard Community Linkages Project DOT149 | 8 | $1.1M | 0% Right of Way/Approvals (Active) | CMAQ: $1,059,744.00 PropC: $264,937.00 Total funding: $1,324,681.00 | 6/30/2028 | — |
| BSS | Cycle 10 Highway Safety Improvement Program - Guardrail Upgrades HSIPSL-5006(926) | CW | $1.0M | Construction | HSIP Cycle 10 | — | — |
| LADOT | HSIP 6 - Traffic Signal Modifications at 7 Locations in SFV DOT055 | 2, 6, 2008 | $999K | 98% Construction (Active) | CTIEP: $500,000.00 HSIP: $730,700.00 Oth: $1,468,946.49 PropC: $81,400.00 Total funding: $2,781,046.49 | 6/30/2026 | — |
| LADOT | Bicycle Corral Program Launch DOT202 | — | $972K | 10% Bid & Award (Active) | CMAQ: $972,000.00 PropC: $244,000.00 Total funding: $1,216,000.00 | 6/30/2031 | — |
| LADOT | Esperanza Elementary SRTS DOT096 | 1, 13 | $911K | 97% Design (Active) | MMLRF: $1,072,461.16 SafeRt: $171,500.00 Total funding: $1,243,961.16 | 6/30/2027 | — |
| BSS | Chandler Blvd. Phase 2 - Strohm Ave | 2 | $850K | Complete | — | — | — |
| LADOT | LANI - Evergreen Park Street Enhancement DOT062 | 14 | $798K | 5% Post-Construction (Active) | CMAQ: $844,000.00 Oth: $10,000.00 PropC: $222,023.00 Total funding: $1,076,023.00 | 6/30/2026 | — |
| LADOT | HSIP 6 - Olympic Blvd Pedestrian Crossing Safety Enhancements DOT172 | 14 | $743K | 90% Post-Construction (Active) | HSIP: $861,300.00 Oth: $73,500.00 PropC: $95,700.00 Total funding: $1,030,500.00 | 6/30/2025 | — |
| LADOT | CicLAvia: South LA Open Street 2026 | 14, 9 | $715K | Planning & Design | Metro Open Streets: $500,000 | 27/28 | — |
| LADOT | Experience the Sepulveda Basin Open Street 2028 | — | $715K | Planning & Design | Metro Open Streets: $500,000 | 28/29 | — |
| LADOT | CicLAvia: South LA Open Street 2028 | 14, 9 | $715K | Planning & Design | Metro Open Streets: $500,000 | 28/29 | — |
| BOS | Lopez Canyon Hazardous Fuels Reduction - Fire Prevention Grants Program | — | $659K | — | — | 3/15/2026 | ⚠ |
| LADOT | Bicycle Friendly Street Treatments DOT016 | 10 | $594K | 80% Bid & Award (Active) | CMAQ: $585,510.00 PropC: $146,378.00 Total funding: $731,888.00 | 6/30/2030 | — |
| BSS | Abbot Kinney LGBTQ Crosswalk | 11 | $574K | Construction | — | — | — |
| LADOT | Central LA MSP 2021: New Pedestrian Crossing at Crenshaw and Brynhurst Ave DOT205 | 8 | $500K | 5% Post Construction (Active) | MMLRF: $500,000.00 Total funding: $500,000.00 | 6/30/2026 | — |
| BSS | Warner Center - Civic Engagement, Equity and Environmental Justice (CEEEJ) Grant SCAG Overall Work Program (OWP): 275.4823.08 | 3 | $500K | Pre-Design | SCAG CEEEJ Grant | — | — |
| LADOT | Central LA MSP 2021: Active Streets LA - South Los Angeles - Northern Segments DOT209 | 8, 9 | $448K | 5% Design (Active) | MMLRF: $447,650.00 Total funding: $447,650.00 | 6/30/2027 | — |
| LADOT | CicLAvia: Meet the Hollywoods 2026 | 13, 4 | $420K | Planning & Design | Metro Open Streets: $320,000 | 27/28 | — |
| LADOT | LANI - Westlake Transit Improvement Project DOT150 | 1 | $400K | 10% Construction (Active) | CTIEP: $471,000.00 SAFTLU: $99,982.00 Total funding: $570,982.00 | 6/30/2027 | — |
| BSS | Harvard - Franklin Crosswalk Improvements | — | $393K | Complete | — | — | — |
| LADOT | Bicycle Wayfinding Signage Program DOT017 | 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12 | $354K | 2% Bid & Award (Active) | CMAQ: $403,000.00 PropC: $101,000.00 Total funding: $504,000.00 | 6/30/2028 | — |
| LADOT | LANI - Byzantine Latino Quarters DOT066 | 1 | $350K | To Be Cancelled (Active) | PropC: $90,000.00 SAFTLU: $360,000.00 Total funding: $450,000.00 | 6/30/2026 | — |
| LADOT | LANI - Koreatown DOT067 | 10 | $331K | 0% Construction (Active) | PropC: $66,998.00 SAFTLU: $179,980.00 Total funding: $246,978.00 | 6/30/2028 | — |
| LADOT | Central LA MSP 2021: New Pedestrian Crossing at Spring St and Ann St DOT210 | 1 | $320K | 92% Design (Active) | MMLRF: $400,000.00 Total funding: $400,000.00 | 6/30/2027 | — |
| LADOT | Wilshire Open Street: Park to Park a Westlake Celebration 2026 | 1, 10 | $234K | Planning & Design | Metro Open Streets: $163,611 | 27/28 | — |
| LADOT | Grand/Chavez First-Last Mile Improvements Project | 1, 13, 14 | $10K | Planning & Design | MAT Cycle 2 | 6/30/2030 | — |
| BSS | TCC - Western/Slauson FLM | 8 | — | Design | — | — | — |
| BSS | TCC - Cool Pavement Project | — | — | Design | — | — | — |