City of Los Angeles Grants Tracker

Grants & Projects

138

Total Value

$1328.0M

budgets & awards

Distribution by Council District

138 grants / projects

138 records — click any row to view details

CD(s)Phase / StatusAuthorization
BSS

Mission Mile: Sepulveda Visioning for a Safe and Active Community

ATPL-5006(920)

7$79.6MComplete

Active Transportation Program Cycle 5

BSS

Broadway-Manchester Active Transportation Equity Project

ATPL-5006(895)

8$68.4MConstruction

ATP Cycle 4

BSS

Western Our Way: Walk and Wheel Improvements

ATPL 5006 (947)

8$54.4MComplete

Active Transportation Program Cycle 6

BSS

Connecting Canoga Park through Safety and Urban Cooling

ATPL-5006(918)

3$53.7MPre-Design

Active Transportation Program Cycle 5

BSS

Osborne St: Path to Park Access Project

ATPL 5006 (946)

7$49.8MPre-Design

Active Transportation Program Cycle 6

BSS

Skid Row Connectivity and Safety Project

ATPL 5006 (944)

14$47.6MPre-Design

Active Transportation Program Cycle 6

BSS

Skid Row Connectivity and Safety Project

$47.5M

PA&ED Phase 6/30/2026
BSS

Wilmington Safe Streets: A People First Approach

ATPL 5006 (945)

15$40.8MPre-Design

Active Transportation Program Cycle 6

BSS

Wilmington Safe Streets: A People First Approach

$40.8M

PA&ED Phase 6/30/2026
BSS

Broadway-Manchester Multi-Modal Green Streets Project (Measure W)

ATPL-5006 (895)

8$38.6MDesign

Safe Clean Water Program Round 2

BSS

Boyle Heights Community Connectivity Project

ATPL - 5006 (951)

14$37.7MPre-Design

Active Transportation Program Cycle 6

BSS

Boyle Heights Community Connectivity Project

$37.7M

PA&ED Phase 6/30/2026
LADOT

CA-2023-131-00

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15$36.5M

Active

Total Federal Funds: $24,422,282 Total Local Match $12,048,000 Total Eligible Project Cost: $36,470,282

4/30/2028
BSS

Eagle Rock Bl Multi-Modal Transportation Improvements

STPL-5006(907)

14$33.5MPre-Design

SR 710 MIP, Measure W

LADOT

CFP2009, CRRSAA & WSCCOG: Exposition II- West Bikeway Northvale Segment

DOT171

5$31.1M

99% Design (Active)

CMAQ: $4,416,000.00 MMLRF: $3,168,000.00 Oth: $3,200,000.00 PropC: $2,826,000.00 SCAG: $13,279,500.00 ST: $5,293,000.00 Total funding: $32,182,500.00

12/31/2026
LADOT

ATP 6: SRTS Center City Schools Neighborhood Safety & Climate Resilience Project

DOT214

1, 10, 13$30.8M

2% Design (Active)

ATP: $30,766,000.00 PropC: $5,472,000.00 Total funding: $36,238,000.00

8/30/2030
BSS

Normandie Beautiful: Creating Neighborhood Connections in South L.A

ATPL 5006 (948)

8$27.8MPre-Design

Active Transportation Program Cycle 6

BOE

Eastern Avenue Multi-Modal Transportation Improvement Project - STPL-R & CMAQ Funds

$24.9M

12/31/2026
LADOT

San Fernando Rd Bikepath Phase IIIA Construction

DOT084

2, 6$24.0M

2% Post-Construction (Active)

ATP: $21,195,000.00 PropC: $4,235,000.00 Total funding: $25,430,000.00

6/30/2027
LADOT

CA-2019-115-00

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15$23.4M

Active

Total Federal Funds: $18,292,150 Total Local Match: $5,089,144 Total eligible cost: $23,381,294

9/1/2028
LADOT

CA-2020-215-00

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15$22.1M

Active

Total Federal Funds: $16,192,200 Total Local Match: $5,909,830 Total Eligible Cost: $22,102,030

9/1/2028
LADOT

Universal Basic Mobility: Phase I South LA UBM Pilot

8, 9, 10$20.2M

Operations

MMLRF: $438,509.76 Oth: $5,927,017.84 CARB STEP: $13,843,298

4/30/2027
LADOT

CA-2025-243-00

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15$19.2M

Active

Total Federal Funds: $15,364,711 Total Local Match: $3,841,181 Total Eligible Cost: $19,205,891

8/1/2028
BOE

ATP Cycle 4 - LA Riverway Segment 1 and 2

$18.6M

7/30/2026
LADOT

Pico Safety and Mobility Plan Project

1, 9, 10$18.4M

95% Design (Active)

MAT Cycle 2: $15,467,473 In-house Vision Zero Program amount TBD (likely to use SB1 local returns)

29/30
LADOT

ATSAC Enhancements for an Advanced Transportation Infrastructure TLSP-5006(913)

DOT204

$18.4M

100% Construction (Active)

Oth: $18,361,000.00 PropC: $400,000.00 Total funding: $18,761,000.00

6/30/2026
LADOT

ATP 4: SRTS Liechty Middle and Neighborhood ES

DOT164

1$18.2M

95% Design (Active)

ATP: $23,198,000.00 CTIEP: $852,625.00 PropC: $6,087,000.00 SCAG: $2,200,000.00 Total funding: $32,337,625.00

6/30/2031
BSS

67th Street and West Boulevard Civil Improvements Project

8$13.0MPre-Construction

LADOT

Boyle Heights/Cesar Chavez Great Streets -Brittania St. to Evergreen Ave.

DOT167

14$13.0M

1% Construction (Active)

CMAQ: $10,787,000.00 MeasR: $1,916,389.00 PropC: $2,523,000.00 Total funding: $15,226,389.00

12/31/2029
BOE

ATP Cycle 3- Downtown Los Angeles Arts District Pedestrian and Cyclist Safety Project

$12.3M

9/30/2026
BSS

Northeast LA Active Transportation & Transit Connectivity Enhancements

STPL-5006(906)

14$11.5MDesign

SR 710 MIP, RIP-STP

BSS

SRTS Berendo Middle and Leo Politi, Hoover Street, and Magnolia Avenue Elementary Schools Project

ATPL-5006(930)

1$11.1MDesign

ATP Cycle 5

LADOT

MAT Cycle 1: Avalon / Martin Luther King / Gage Corridor

DOT190

9$10.3M

98% Design (Active)

MMLRF: $8,023,724.00 PropC: $2,176,276.00 Total funding: $10,200,000.00

6/30/2028
BSS

Pico Blvd and Flower St Improvements (RCN Grant)

N/A

14$10.0MComplete

FTA Recoonecting Community and Neighbor Grant

LADOT

CFP2009 & CRRSAA: L.A. River Bike Path - Phase IV Construction

DOT060

4$9.3M

86% Design (Active)

CMAQ: $1,827,000.00 Oth: $4,959,630.00 PropC: $457,000.00 Total funding: $7,243,630.00

12/31/2026
LADOT

Central Avenue Historic Corridor Streetscape - LAF3656

DOT199

9$8.5M

0% Construction (Active)

CTIEP: $6,600,000.00 PropC: $891,000.00 RSTP: $1,697,000.00 Total funding: $9,188,000.00

6/30/2030
BSS

Wayfinding & Transit Amenities in Downtown Los Angeles

14$8.4MPre-Design

LADOT

WSCCOG: Westwood Boulevard Safety and Mobility Project

DOT221

5$8.0M

5% Design

MMLRF: $9,600,000.00 Total funding: $9,600,000.00

7/1/2030
BSS

Maya Corridor Streetscape

1$7.7MComplete

CRA/LA Excess Bond Proceeds

LADOT

HSIP 8 Left Turn Signal Modification and Median Island

DOT177

2, 3, 4, 6, 7, 8, 9, 11, 12, 15$7.1M

45% Construction (Active)

CTIEP: $2,000,000.00 HSIP: $5,244,400.00 Oth: $334,964.34 PropC: $582,711.11 ST: $1,000,000.00 Total funding: $9,162,075.45

6/30/2028
LADOT

WSCCOG: Santa Monica to Westwood Stress-Free Bicycle Enhanced Corridor

DOT192

5, 11$6.7M

65% Design (Active)

MMLRF: $10,406,584.00 Total funding: $10,406,584.00

6/30/2029
BSS

Martin Luther King (MLK) Bl Streetscape

9$6.5MDesign

CTIEP

LADOT

HSIP 7 - RRFB Ramps and Median Islands - 28 locations

DOT175

1, 4, 5, 8, 9, 11, 13, 14, 15$6.5M

75% Construction (Active)

HSIP: $4,140,800.00 Total funding: $4,140,800.00

6/30/2028
LADOT

ATP 5: SRTS Panorama City Elementary School Project

DOT196

6$6.1M

35% Design (Active)

ATP: $6,149,000.00 PropC: $683,000.00 Total funding: $6,832,000.00

6/30/2031
LADOT

ATP 5: SRTS Carver Middle and Ascot Avenue and Harmony Elementary Schools Project

DOT197

9$6.0M

50% Design (Active)

ATP: $6,030,000.00 PropC: $670,000.00 Total funding: $6,700,000.00

6/30/2031
BSS

El Sereno Active Transportation & Transit Connectivity Enhancements

STPL-5006(911)

14$6.0MDesign

SR 710 MIP

LADOT

Universal Basic Mobility: Phase II South LA EcoLab

DOT220 DOT218

8, 9$5.7M

SFC: 26% Construction (Active) Chargers: 50% Construction (Active) E-bike Library: Operations

PropC: $67,212 MMLRF: $132,235 Prop A: $67,775 Measure R: $250,000 Oth: $1,100,000 TCC: $4,130,028

8/1/2028
LADOT

ATP 4: SRTS 112th St. and Flournoy ES Safety IMPR Project

DOT163

15$5.6M

50% Bid & Award (Active)

ATP: $5,600,000.00 PropC: $1,399,000.00 Total funding: $6,999,000.00

3/21/2031
LADOT

HSIP 7 - Left Turn Phasing - 17 locations citywide

DOT174

2, 4, 8, 9, 10, 12, 15$5.4M

75% Construction (Active)

HSIP: $4,496,900.00 Total funding: $4,496,900.00

6/30/2028
LADOT

HSIP 8 - New Signals

DOT176

3, 5, 6, 8, 9, 10$5.3M

95% Construction (Active)

CTIEP: $1,580,097.13 HSIP: $4,755,600.00 PropC: $528,400.00 Total funding: $6,864,097.13

6/30/2027
LADOT

Chandler Cycletrack Gap Closure Project

DOT137

2, 4$5.1M

5% Construction (Active)

CMAQ: $3,177,750.00 PropC: $794,437.00 ST: $1,900,000.00 Total funding: $5,872,187.00

6/30/2028
LADOT

Figueroa Street Mall 2028

14, 9$5.1M

Planning & Design

Metro Open Streets: $1,032,549 SS4A: $2,862,500

28/29
BSS

Clean CA - Martin Luther King Jr. Boulevard Equity & Connectivity through Greening

CCL-5006(936)

9$5.0MConstruction

Clean California Local Grant Program

BSS

Clean CA - Creating Urban Habitat & Biodiversity through Median Greening

CCL-5006(934)

1, 8, 9, 10, 15$5.0MConstruction

Clean California Local Grant Program

LADOT

Traffic Signal Rail Crossing Improvement Project

DOT131

$4.4M

5% Construction (Active)

LT: $4,179,400.00 PropC: $1,044,850.00 Total funding: $5,224,250.00

2/28/2026
LADOT

Central LA MSP 2021: Lockwood Ave ES SRTS Plan

DOT208

13$4.4M

3% Pre-Design (Active)

MMLRF: $4,400,000.00 Total funding: $4,400,000.00

N/A Project funds to be repurposed
LADOT

2017 Earmark - Northeast Valley Traffic and Mobility Improvements

DOT153

7$4.4M

80% Post-Construction (Active)

PropC: $1,165,536.00 SAFTLU: $4,662,146.00 Total funding: $5,827,682.00

6/30/2027
LADOT

ATP 4: SRTS Alexandria Avenue ES Neighborhood Safety IMPR Project

DOT165

10, 13$4.2M

99% Design (Active)

ATP: $4,480,000.00 PropC: $1,120,000.00 Total funding: $5,600,000.00

6/30/2030
LADOT

CA-2024-148-00

15$4.1M

Active

Total Federal Funds: $3,136,998 Total Non-Federal Share $829,250 Total Eligible Project Cost: $4,146,247

3/31/2029
LADOT

CA-2020-202-01

14$4.0M

Active

Total Federal Funds: $3,215,977 Total Local Match $803,994 Total Eligible Project Cost: $4,019,971

1/1/2027
LADOT

San Fernando Rd Widening at Balboa Rd

DOT179

12$3.9M

0% Construction (Active)

CMAQ: $1,061,000.00 CTIEP: $1,409,698.00 Oth: $1,000,000.00 PropC: $1,109,462.00 Total funding: $4,580,160.00

6/30/2028
LADOT

Olympic Blvd and Mateo Street Imp

DOT178

14$3.9M

3% Post-Construction (Active)

LT: $4,624,000.00 PropC: $2,490,308.00 Total funding: $7,114,308.00

2/28/2026
LADOT

HSIP 6 Project 3 - RRFB and New Traffic Signals at 27 Locations

DOT173

1, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15$3.6M

99% Construction (Active)

HSIP: $1,003,520.00 Oth: $2,638,704.30 PropC: $143,400.00 Total funding: $3,785,624.30

6/30/2029
BSS

MAT FLM - Sepulveda/OL

4, 6$3.6MDesign

Measure M MAT - Metro Active Transport

LADOT

Mid City - Low Stress Bicycle Enhancement Corridors

DOT147

4, 13$3.6M

50% Construction (Active)

CMAQ: $1,806,765.00 CTIEP: $1,810,500.00 PropC: $883,629.00 SCAG: $1,810,419.00 Total funding: $6,311,313.00

6/30/2028
LADOT

WSCCOG: Connect Del Rey Stress-Free Bicycle Enhanced Corridor

DOT194

11$3.5M

50% Design (Active)

MMLRF: $6,212,768.00 Total funding: $6,212,768.00

6/30/2029
LADOT

Universal Basic Mobility: Phase III UBM E-bike Voucher Program

$3.4M

Planning & Design

Metro Call for Projects: $1,518,124 MMLRF: $398,267 LCFS: $1,500,000

2/28/2026
LADOT

Balboa Bl Widening at Devonshire Street - 2011 Call

DOT166

12$3.4M

98% Construction (Active)

CTIEP: $1,569,392.00 PropC: $650,629.00 RSTP: $1,208,311.00 Total funding: $3,428,332.00

6/30/2026
BSS

MAT (FLM) Aviation/LAX

$3.3MDesign

LADOT

Pedestrian Improvements along Central Ave from Washington to Vernon Ave

DOT198

9$3.0M

99% Design (Active)

CTIEP: $1,500,000.00 PropC: $414,000.00 SAFTLU: $1,490,234.00 Total funding: $3,404,234.00

6/30/2030
LADOT

SBCCOG MSP: Wilmington Neighborhood Friendly Streets

DOT159

15$3.0M

12% Pre-Design (Active)

MMLRF: $3,000,600.00 Total funding: $3,000,600.00

6/30/2030
BSS

Revitalize Rose Avenue - A Pedestrian Connectity & Beautification Project

11$3.0MDesign

BOS

Volkswagen Environmental Mitigation Trust Program 2021 - Volkswagen Environmental Mitigation Trust Program 2021

$3.0M

5/1/2025
LADOT

Central LA MSP 2021: Integrated Mobility Hubs Program

DOT211

13, 14$2.8M

90% Design (Active)

MMLRF: $2,790,491.00 Total funding: $2,790,491.00

5/20/2029
LADOT

SBCCOG MSP: Crossing Upgrades

DOT161

15$2.8M

99% Design (Active)

MMLRF: $3,260,625.00 Total funding: $3,260,625.00

6/30/2030
LADOT

HSIP 11 - Figueroa Priority Corridor Systemic Safety Improvements

DOT215

8, 9$2.6M

0% Bid & Award (Active)

HSIP: $2,383,830.00 PropC: $264,870.00 Total funding: $2,648,700.00

2/28/2029
LADOT

TCC - Watts Rising - Walkbike Watts

DOT181

15$2.6M

98% Post-Construction (Active)

Oth: $3,092,760.00 Total funding: $3,092,760.00

12/31/2025
BSS

Brentwood Walkability Enhancements

MM4801.08

11$2.6MConstruction

Measure M MSP - Active Transportation

LADOT

ATCMTD - Mobility enhancements and traffic safety in the Los Angeles Promise Zone

DOT212

$2.4M

79% Construction (Active)

Oth: $3,000,000.00 Total funding: $3,000,000.00

5/31/2027
BSS

Walk Pico! A Catalyst for Community Vitality & Connectivity

CML-5006(862)

5$2.3MConstruction

2013 Metro Call for Projects

BSS

Washington Bl Transit Enhancements Phase 2

CML-5006(856)

9, 14$2.3MConstruction

2011 Call for Projects/CRA

BSS

L.A. River Bike Path - Phase IV Construction

4$2.3MDesign

Metro Call for Projects

LADOT

SBCCOG MSP: ATSAC Communications System Resiliency Improvement in San Pedro

DOT157

15$2.3M

75% Construction (Active)

MMLRF: $2,500,000.00 Total funding: $2,500,000.00

6/30/2026
BOE

CA Natural Resources Agency - Urban Greening Grant

$2.2M

3/31/2028
LADOT

HSIP 6 - 5 New Signals in HW and SP

DOT050

8, 13, 15$2.1M

98% Construction (Active)

CTIEP: $500,000.00 HSIP: $888,200.00 Oth: $944,866.65 PropC: $98,800.00 Total funding: $2,431,866.65

6/30/2026
LADOT

Central LA MSP 2021: Los Angeles SRTS Elementary School

DOT206

10$2.1M

0% Pre-Design (Active)

MMLRF: $2,098,103.00 Total funding: $2,098,103.00

N/A Project funds to be repurposed
LADOT

TCC: South LA Eco Lab - EV Carshare

DOT219

8, 9, 10$2.1M

Cancelled

Oth: $1,468,475.00 TCC: $2,097,160.00 Total funding: $3,565,635.00

9/30/2025
LADOT

Wilshire Open Street: Park to Park a Westlake Celebration 2028

1, 10$2.0M

Planning & Design

Metro Open Streets: $163,611 SS4A: $1,431,250

28/29
LADOT

SBCCOG MSP: Signal Operational Improvements

DOT160

15$2.0M

5% Construction (Active)

MMLRF: $2,500,000.00 Total funding: $2,500,000.00

6/30/2029
LADOT

Imperial Highway Bike Lanes

DOT056

11$1.9M

98% Construction (Active)

CMAQ: $1,858,000.00 PropC: $464,000.00 Total funding: $2,322,000.00

6/30/2027
LADOT

HSIP 6 - 5 New Signals

DOT049

4, 5$1.8M

98% Construction (Active)

CTIEP: $500,000.00 HSIP: $845,800.00 Oth: $650,287.01 PropC: $94,100.00 Total funding: $2,090,187.01

6/30/2026
LADOT

Hollywood Open Street 2028

13$1.8M

Planning & Design

SS4A: $1,431,250

28/29
LADOT

HSIP 10 - Retroreflective backplate upgrades

DOT203

$1.7M

61% Construction (Active)

HSIP: $1,884,000.00 Total funding: $1,884,000.00

6/30/2029
LADOT

SR710 LATIP: DASH El Sereno / City Terrace

DOT155

14$1.6M

99% Right of Way/Approvals (Active)

CMAQ: $2,000,000.00 Total funding: $2,000,000.00

12/31/2030
LADOT

SBCCOG MSP: ATSAC Fiber Communications Network Integration with LA County

DOT158

15$1.6M

75% Construction (Active)

MMLRF: $2,000,000.00 Total funding: $2,000,000.00

12/31/2026
LADOT

SMART: Code the Curb: DTLA (Digital Curb Management)

DOT216

9, 14$1.6M

95% Design (Active)

Oth: $2,000,000.00 Total funding: $2,000,000.00

LADOT

North Hollywood Open Street 2028

2$1.6M

Planning & Design

Metro RCN Grant: $1,600,000

28/29
LADOT

2016 Earmark - Install Leading Pedestrian Interval (LPI), Pedestrian Actuated Warning Devices (AWDs

DOT152

1, 2, 3, 4, 6, 11, 12, 13$1.6M

10% Post-Construction (Active)

CTIEP: $492,000.00 Oth: $1,846,102.00 PropC: $2,010,371.00 Total funding: $4,348,473.00

6/30/2025
LADOT

Menlo Ave / MLK Vermont Expo Station Ped Improvements

DOT076

9$1.5M

0% Design (Active)

CMAQ: $1,687,350.00 PropC: $1,615,000.00 Total funding: $3,302,350.00

12/31/2026
BOS

GREENfiltration - Urban and Community Forestry Grant Program

$1.5M

3/30/2026
LADOT

SR710 LATIP: DASH Highland Park / Eagle Rock

DOT156

14$1.5M

10% Bid & Award (Active)

CMAQ: $1,500,000.00 Total funding: $1,500,000.00

12/31/2026
BSS

Laurel Canyon Blvd and Wicks St. ADA Improvements

CD 6$1.5MDesign

BOE

Surface Transportation Program – Local Regional Funds (Soto St Widening between Multnomah and Mission)

$1.4M

12/31/2026
LADOT

CA-2025-253-00

13, 14$1.4M

Active

Total Federal Funds: $1,208,000 Total Local Match: $156,509 Total eligible cost: $1,364,509

5/20/2029
LADOT

Valencia Triangle Landscape Beautification Plaza

DOT101

1$1.3M

95% Design (Active)

LT: $553,000.00 MMLRF: $733,397.00 PropC: $298,000.00 Total funding: $1,584,397.00

6/30/2027
LADOT

Central LA MSP 2021: Manchester Elementary SRTS

DOT213

8$1.3M

50% Construction (Active)

MMLRF: $1,623,500.00 Total funding: $1,623,500.00

6/30/2028
LADOT

ATP 2 - Pedestrian and Bicycle Neighborhood Intersection Enhancements

DOT162

5, 7, 9, 14$1.3M

2% Post-Construction (Active)

ATP: $1,396,000.00 PropC: $349,000.00 Total funding: $1,745,000.00

6/30/2025
BSS

San Vicente Median Greening

11$1.2MDesign

Design

LADOT

Western Av Bus Stop & Pedestrian Improvement

DOT107

8, 10$1.2M

90% Post-Construction (Active)

CMAQ: $1,178,000.00 PropC: $294,500.00 Total funding: $1,472,500.00

6/30/2025
LADOT

Westlake MacArthur Park Pedestrian Improvement

DOT108

1$1.2M

1% Post-Construction (Active)

CMAQ: $1,182,666.00 PropC: $295,667.00 Total funding: $1,478,333.00

6/30/2028
LADOT

LANI - West Boulevard Community Linkages Project

DOT149

8$1.1M

0% Right of Way/Approvals (Active)

CMAQ: $1,059,744.00 PropC: $264,937.00 Total funding: $1,324,681.00

6/30/2028
BSS

Cycle 10 Highway Safety Improvement Program - Guardrail Upgrades

HSIPSL-5006(926)

CW$1.0MConstruction

HSIP Cycle 10

LADOT

HSIP 6 - Traffic Signal Modifications at 7 Locations in SFV

DOT055

2, 6, 2008$999K

98% Construction (Active)

CTIEP: $500,000.00 HSIP: $730,700.00 Oth: $1,468,946.49 PropC: $81,400.00 Total funding: $2,781,046.49

6/30/2026
LADOT

Bicycle Corral Program Launch

DOT202

$972K

10% Bid & Award (Active)

CMAQ: $972,000.00 PropC: $244,000.00 Total funding: $1,216,000.00

6/30/2031
LADOT

Esperanza Elementary SRTS

DOT096

1, 13$911K

97% Design (Active)

MMLRF: $1,072,461.16 SafeRt: $171,500.00 Total funding: $1,243,961.16

6/30/2027
BSS

Chandler Blvd. Phase 2 - Strohm Ave

2$850KComplete

LADOT

LANI - Evergreen Park Street Enhancement

DOT062

14$798K

5% Post-Construction (Active)

CMAQ: $844,000.00 Oth: $10,000.00 PropC: $222,023.00 Total funding: $1,076,023.00

6/30/2026
LADOT

HSIP 6 - Olympic Blvd Pedestrian Crossing Safety Enhancements

DOT172

14$743K

90% Post-Construction (Active)

HSIP: $861,300.00 Oth: $73,500.00 PropC: $95,700.00 Total funding: $1,030,500.00

6/30/2025
LADOT

CicLAvia: South LA Open Street 2026

14, 9$715K

Planning & Design

Metro Open Streets: $500,000

27/28
LADOT

Experience the Sepulveda Basin Open Street 2028

$715K

Planning & Design

Metro Open Streets: $500,000

28/29
LADOT

CicLAvia: South LA Open Street 2028

14, 9$715K

Planning & Design

Metro Open Streets: $500,000

28/29
BOS

Lopez Canyon Hazardous Fuels Reduction - Fire Prevention Grants Program

$659K

3/15/2026
LADOT

Bicycle Friendly Street Treatments

DOT016

10$594K

80% Bid & Award (Active)

CMAQ: $585,510.00 PropC: $146,378.00 Total funding: $731,888.00

6/30/2030
BSS

Abbot Kinney LGBTQ Crosswalk

11$574KConstruction

LADOT

Central LA MSP 2021: New Pedestrian Crossing at Crenshaw and Brynhurst Ave

DOT205

8$500K

5% Post Construction (Active)

MMLRF: $500,000.00 Total funding: $500,000.00

6/30/2026
BSS

Warner Center - Civic Engagement, Equity and Environmental Justice (CEEEJ) Grant

SCAG Overall Work Program (OWP): 275.4823.08

3$500KPre-Design

SCAG CEEEJ Grant

LADOT

Central LA MSP 2021: Active Streets LA - South Los Angeles - Northern Segments

DOT209

8, 9$448K

5% Design (Active)

MMLRF: $447,650.00 Total funding: $447,650.00

6/30/2027
LADOT

CicLAvia: Meet the Hollywoods 2026

13, 4$420K

Planning & Design

Metro Open Streets: $320,000

27/28
LADOT

LANI - Westlake Transit Improvement Project

DOT150

1$400K

10% Construction (Active)

CTIEP: $471,000.00 SAFTLU: $99,982.00 Total funding: $570,982.00

6/30/2027
BSS

Harvard - Franklin Crosswalk Improvements

$393KComplete

LADOT

Bicycle Wayfinding Signage Program

DOT017

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12$354K

2% Bid & Award (Active)

CMAQ: $403,000.00 PropC: $101,000.00 Total funding: $504,000.00

6/30/2028
LADOT

LANI - Byzantine Latino Quarters

DOT066

1$350K

To Be Cancelled (Active)

PropC: $90,000.00 SAFTLU: $360,000.00 Total funding: $450,000.00

6/30/2026
LADOT

LANI - Koreatown

DOT067

10$331K

0% Construction (Active)

PropC: $66,998.00 SAFTLU: $179,980.00 Total funding: $246,978.00

6/30/2028
LADOT

Central LA MSP 2021: New Pedestrian Crossing at Spring St and Ann St

DOT210

1$320K

92% Design (Active)

MMLRF: $400,000.00 Total funding: $400,000.00

6/30/2027
LADOT

Wilshire Open Street: Park to Park a Westlake Celebration 2026

1, 10$234K

Planning & Design

Metro Open Streets: $163,611

27/28
LADOT

Grand/Chavez First-Last Mile Improvements Project

1, 13, 14$10K

Planning & Design

MAT Cycle 2

6/30/2030
BSS

TCC - Western/Slauson FLM

8Design

BSS

TCC - Cool Pavement Project

Design